Laboratory UPS and power backup planner

Estimate backup load, UPS capacity and a first-pass battery requirement.

How to use this tool

  1. Enter a realistic normal workload, not only a peak day.
  2. Use supplier documents or measured values where available.
  3. Test a conservative scenario before requesting proposals.

Required to calculate. Inputs are not stored.

Use the result in your next decision

Request comparable UPS, battery and generator proposals with stated runtime and test conditions.

Planning disclaimer: Electrical design, protection, battery and installation require qualified professional and manufacturer validation.